To support the completion of a new treatment building and associated car park at Weston Park Hospital, Henry Boot Construction commissioned a comprehensive civils package as part of the external development works.
Stockton Group was appointed to deliver the civil engineering scope, undertaking retaining structures, drainage installations, surfacing, utility connections, and external finishing works. The project required precise planning and flexible delivery to overcome steep site levels, restricted access, and constrained city-centre working conditions.
The Rutland Mills and Tileyard North regeneration is one of the most significant heritage-led development projects in the North of England, set to transform ten acres of Wakefield’s historic riverside into a major cultural destination. As part of the wider masterplan, City & Provincial Properties commissioned a complex civils and river infrastructure package to protect the site from future flood events and unlock the next
Stockton Group was appointed as principal contractor to deliver the works, undertaking flood defence structures, river engineering, drainage infrastructure, reinforced concrete works, and associated repairs to existing buildings. The project required specialist planning, environmental approvals from the Environment Agency and the Canal & Rivers Trust, and innovative construction methods to safely deliver works both on land and within the River Calder.
New fire protection cladding was needed for the exterior of Manor and Trinity House in Wakefield, as part of a high-rise building safety upgrade.
As part of the external wall insulation (EWI) programme Kier Construction commissioned a specialist civils package to support the installation of this cladding.
Stockton Group was appointed to deliver the civil engineering scope, undertaking the site preparation, setting out, reinforced concrete works, and external enabling works. The project required careful logistical planning and close stakeholder coordination to maintain public access while working within live bus lanes and busy pedestrian routes.
To support the construction of a new driving test centre in Kingstanding, Kier Construction commissioned a full civils works package as part of the site development.
Stockton Group was appointed to deliver the civil engineering scope, undertaking drainage infrastructure, foundations, reinforced concrete works, and hard and soft landscaping. The project required careful sequencing and technical problem-solving to overcome ground level constraints and groundwater challenges while maintaining programme delivery.
To support the expansion of facilities at Allerton Grange School in Leeds, a new extension and associated car park infrastructure was commissioned as part of a wider development led by Tilbury Douglas.
Stockton Group was appointed to deliver a range of civils works, undertaking a comprehensive scope of works including substructures, drainage, reinforced concrete, and full construction of the car park. The project required a coordinated, multi-disciplinary approach to ensure safe, compliant, and timely delivery within a live educational environment.
To support the redevelopment of hospitality and external areas at the southern end of York Racecourse, Lindum Group commissioned a comprehensive civils works package ahead of the 2024 race season
Stockton Group was appointed to deliver the works, providing the substructure, reinforced concrete works, drainage infrastructure, service ducting, and hard landscaping. The project demanded precise sequencing and forward planning to accommodate tight schedule constraints and high volumes of concurrent site activity.
Britvic Soft Drinks owns popular brands including Robinsons, Tango, and J20, and has multiple factories in the UK, with the largest located in Rugby. This site is one of Europe’s biggest soft drinks factories by volume and is continually expanding with over £50 million of investment into increasing its production and distribution capabilities.
Stockton Group was brought in to construct the infrastructure for Britvic’s new can-line building, carrying out a wide range of civils work including drainage, RC works and foundations.
The transformation of the Headingley Campus of Leeds Beckett University presented a highly challenging project, involving bringing a Grade II listed building, Caedmon Hall, up to date to meet modern standards.
Stockton Group was appointed to deliver the civil engineering and infrastructure works, undertaking a comprehensive scope that included external and internal drainage, a new service trench, foundations, and a structural slab. The project also incorporated extensive hard and soft landscaping to enhance the surrounding environment.