Stockton Drilling Services Pipe

Stockton Drilling is a highly experienced and reputable UK based contractor, who consistently delivers the following services to an exceptional level:

Pipeline Installation

Our team is highly experienced, technically adept and efficient in all aspects of open cut pipeline installation. Stockton is able to provide any or all of the following:

  • Design
  • Feasabilities
  • Procurement
  • Installation
  • Reinstatement

Horizontal Directional Drilling (HDD)

HDD is a specialist technique designed to install pipelines under obstructions; rivers, roads, canals, railways, runways, estuaries, Sites of Special Scientific Interest, farmland and even other pipelines. Diameters range from 6” to 48”, with lengths from 300m to 1800m.

The principle is simple, and yet the skill and experience required to get it absolutely right is significant. In the simplest terms, HDD installation is achieved in just three stages:

Stage 1

First a pilot hole is drilled.

Stage 2

The hole is reamed out to the required diameter to accommodate the product pipe.

Stage 3

Finally the pipeline is pulled or pushed through the pre-drilled hole.

Equipment Hire

In addition to undertaking projects we also hire out specialist horizontal directional drilling equipment. Please contact our Head Office in Wakefield with your specific requirements.

Back to top

 

Designed at B&W studio

HORIZONTAL DIRECTIONAL DRILLING